Ongoing Projects

Name of Project:

MINISTRY OF ELECTRICITY AND WATER AFFAIRS – KINGDOM OF BAHRAIN

14 MWac SOLAR PV POWER PLANT THROUGH BUILD-OWN-OPERATE-MAINTAIN (BOOM) MODEL FOR THE BAHRAIN INTERNATIONAL CIRCUIT (FORMULA-I)

Operation Term: 20 YEARS

Details:

THE POWER PLANT WILL BE BUILT ON A TOTAL GROUND AREA OF 195.000 SQM AND 14.0 MWac CAPACITY. A GALVANIZED STEEL PARKING LOT WILL BE BUILT. SOLAR ENERGY WILL BE PROVIDED BY SOLAR PV PANELS PLACED ON THE CAR PARK SHADES OF THE PARKING LOTS.

Name of Project:

MINISTRY OF ELECTRICITY AND WATER AFFAIRS – KINGDOM OF BAHRAIN

40.0 MWac SOLAR PV POWER PLANT THROUGH BUILD-OWN-OPERATE-MAINTAIN (BOOM) MODEL FOR THE UNIVERSITY OF BAHRAIN (UOB)

Operation Term: 20 YEARS

Details:

THE POWER PLANT WILL BE BUILT ON A TOTAL AREA OF 405.000 SQM AND 40.0 MWac CAPACITY.

26.0 MWAC CAPACITY WILL BE GROUND-MOUNTED AND 14.0 MWAC WILL BE CAR PARK SHADES.

Name of Project:

MINISTRY OF ELECTRICITY AND WATER AFFAIRS – KINGDOM OF BAHRAIN

14.0 MWac SOLAR PV POWER PLANT THROUGH BUILD-OWN-OPERATE-MAINTAIN (BOOM) MODEL FOR THE BAHRAIN TOURISM AND EXHBITION CENTER (BTEA)

Operation Term: 20 YEARS

Details:

THE POWER PLANT WILL BE BUILT ON A TOTAL ROOFTOP AREA OF 103.000 SQM AND 14.0 MWac CAPACITY. THE ENTIRE POWER PLANT WILL BE INSTALLED ON THE ROOFTOP OF THE EXHIBITION HALLS.

Name of Project:

MINISTRY OF ELECTRICITY AND WATER AFFAIRS – KINGDOM OF BAHRAIN

4.0 MWac SOLAR PV POWER PLANT THROUGH BUILD-OWN-OPERATE-MAINTAIN (BOOM) MODEL FOR THE AL DANA AMPHITHEATRE (ADA)

Operation Term: 20 YEARS

Details:

THE POWER PLANT WILL BE BUILT ON A TOTAL GROUND AREA OF 31.000 SQM AND 4.0 MWac AND 4.0 MW ac CAPACITY.A GALVANIZED STEEL PARKING LOT WILL BE BUILT. SOLAR ENERGY WILL BE PROVIDED BY SOLAR PV PANELS PLACED ON THE CAR PARK SHADES OF THE PARKING LOTS.